Scope & Design Control
Every project begins with a controlled transfer of scope, site conditions and design intent.
Control points
- Sales-to-project handover
- Document review and site survey
- Technical design and interface definition
- Schedule and design-change control
Project evidence
- Approved function and scope list
- Solution and interface drawings
- Project schedule and briefing record
A build-ready scope with fewer ambiguities at installation and acceptance.

